In the ever-evolving realm of multifamily development, the stopwatch has been reset to unprecedented heights, marking a journey from groundbreaking to completion that now stretches across a record 25-month horizon. This prolonged timeline, a culmination of supply chain woes and pandemic-induced interruptions, hints at potential pitfalls awaiting the market in the year 2026.
Embarking on a retrospective voyage spanning the past nine years, we witness a steady ascent in construction durations, transitioning from an 18-month sprint to a marathon surpassing the two-year mark. Peaks and valleys dot this trajectory, with notable spikes observed in the latter half of 2022 and early 2023, echoing similar crescendos in 2016 and 2017, preludes to the pandemic upheaval that ensued.
At the heart of this temporal expansion lies a fundamental shift in architectural ethos, as the landscape of multifamily housing evolves. Once dominated by the simplicity and expediency of garden apartment complexes, the terrain now boasts a proliferation of mid-rise and high-rise marvels, laden with complexities like elevators and structured parking. The erstwhile simplicity of garden apartments, often sprouting within the verdant embrace of Sun Belt markets, yielded swift completions in as little as 12 months. Contrastingly, the ascent of mid-rise and high-rise constructs elongates the construction cycle, spanning a formidable two to three years, contingent upon locale and intricacy.
Venturing into the heartland, the Midwest emerges as a crucible of this temporal metamorphosis. Here, the average gestation period for new multifamily ventures burgeons by a staggering 426 days since 2014, transforming the landscape with projects like The Quin, an embodiment of contemporary living nestled in Schaumburg's urban tapestry. Such mid-rise enclaves, once anomalies, now thread through cities like Chicago, Columbus, and suburban Indianapolis, threading the fabric of the region with extended timelines.
Meanwhile, in the enigmatic expanse of the West, the chronicle unfolds with a familiar cadence, echoing the protracted timelines witnessed since 2014. Here, amidst the rugged terrain and urban sprawls, the gestation of multifamily abodes extends to a daunting two and a half years on average, underscoring the region's resilience to temporal compression.
Yet, amidst this labyrinth of construction timelines, a specter looms on the horizon – the specter of supply lagging behind demand. As multifamily markets grapple with the aftershocks of oversupply, the prolonged construction lead times threaten to impede a timely response once equilibrium is restored. Should the anticipated surge of completed units fail to materialize in synchrony with market absorption, the specter of rent growth acceleration looms large on the horizon.
As the curtains rise on the stage of multifamily development, a dwindling number of projects break ground, emblematic of the hurdles thwarting developers' aspirations. Hindered by a confluence of factors – from elusive construction debt to bureaucratic red tape and soaring material costs – the industry finds itself at a crossroads, where the path to 2026 teeters on the precipice of uncertainty.
In this ever-shifting landscape, the multifamily market braces itself for the challenges ahead, navigating the labyrinth of construction timelines with resilience and foresight, poised to script a new chapter in the saga of urban living.
Source: MMCG Analytics, Jay Lybik, CoStar Analytics